Tarong Power Station, Queensland Information & Tarong Power Station, Queensland Links at HealthHaven.com
advertise
add site
services
publishers
database
health videos
Bookmark and Share

search wiki for    ?
web dir firms image gallery news pdf wiki shop video 
about
toolbar
stats
live show
health store
more stuff
JOIN/LOGIN
Featured Results:
Body Power 7 Station Power Builder
Body Power 7 Station Power Builder
motionfitness.net
 Single Station Machine Argos Sports Single Station Smith Machines Buy...
Single Station Machine Argos Sports Single Station Smith Machines Buy...
argos-sports.co.uk
 Multi Stations, Used Multi Stations,Commercial Multi Stations
Multi Stations, Used Multi Stations,Commercial Multi Stations
usedgymequipment.com
 Super College Station Cosmetic Dentists - Superb College Station...
Super College Station Cosmetic Dentists - Superb College Station...
wacocosmeticdentist.com
 
Tarong Power Station
Location Queensland,
Owner Tarong Energy
Fuel Bituminous Coal
Technology Steam Turbine
Turbines 4
Maximum Capacity 1,470 MW
Commissioned 1984

The Tarong Power Station is a coal fired power station located on a 1500 hectare site near the Burnett River and Nanango, in Queensland, Australia. The station has a maximum generating capacity of 1470 megawatts, generated from a total of four turbines. Tarong Energy is the Queensland Government owned corporation that currently manages the plant.

Coal is supplied via a conveyor from Meandu Mine, which is 1.5 km away. The mine was operated by Rio Tinto Coal Australia. However Tarong Energy has recently purchased this mine. Coal supply beyond 2010 will most probably be delivered from the yet to be developed Kunioon Mine.

Contents

[edit] Water supply

Water is supplied via pipeline from Boondooma Dam, west of Proston and Wivenhoe Dam. However due to drought conditions persisting, the Queensland Government directed the plant to stop taking water from Wivenhoe Dam from the 1 March 2006. [1] These water supply problems reduced electrical output to less than half of maximum capacity.[2] In 2007, the Western Corridor Recycled Water Project began delivery of recycled water to the power station allowing electical output to increase again.[3]

[edit] Emissions

The power station emits 9.84 million tonnes of greenhouse gases each year[4] as a result of burning coal. Greenhouse gases may be responsible for climate change. The IPCC says that developed countries should reduce greenhouse gas emissions by 25 to 40% by 2020 and by 80 to 95% by 2050. [5]. The Australian government has announced a target for reduction of greenhouse gas emissions of 60% from 2000 levels by 2050.

[edit] See also

[edit] References

  1. ^ Tarong Energy: Water. Retrieved on 23 May 2007.
  2. ^ Tarong Power Station to save more water Queensland Government Media Release. 15 March 2007. Retrieved 14 April 2007.
  3. ^ Greg Roberts (2008-10-30). "Flush then drink in the Sunshine State". The Australian. News Limited. http://www.theaustralian.news.com.au/story/0,,24572253-30417,00.html?from=public_rss. Retrieved 2009-07-10. 
  4. ^ Tarong Power Plant: Plant overview. Carbon Monitoring for Action. Retrieved on 17 November 2008
  5. ^ , IPCC Fourth Assessment Report Working Group III Report "Mitigation of Climate Change" , Intergovernmental Panel on Climate Change, Working Group III, p776 Ch13 Policies, Instruments and Co-operative Arrangements. (Report). Retrieved on 2008-11-14.

[edit] External links




Product Results (view all...)

search wiki for    ?
web dir firms image gallery news pdf wiki shop video 



↑ top of page ↑about thumbshots