Hiawatha Line Information & Hiawatha Line Links at HealthHaven.com
advertise
add site
services
publishers
database
health videos
Bookmark and Share

search wiki for    ?
web dir firms image gallery news pdf wiki shop video 
about
toolbar
stats
live show
health store
more stuff
JOIN/LOGIN
Featured Results:
Contouring Treatments For Smile Line , Marionette Line s, Facial...
Contouring Treatments For Smile Line, Marionette Lines, Facial...
charmingskin.com
 Albuquerque Dentist - Derek Line s, D.D.S. - Albuquerque, New Mexico -...
Albuquerque Dentist - Derek Lines, D.D.S. - Albuquerque, New Mexico -...
myalbuquerquedentist.com
  Line Filler, Frown Line s & Fine Line s Remover, Anti Aging Skin Care...
Line Filler, Frown Lines & Fine Lines Remover, Anti Aging Skin Care...
skinrxclinic.com
 Main Line Health - Main Line HealthCare
Main Line Health - Main Line HealthCare
mainlinehealth.org
 
     Hiawatha Line

Light rail train near Cedar-Riverside Station
Info
Type Light rail
System Metro Transit
Status Operational
Locale Minneapolis-St. Paul metropolitan: Minneapolis, Minnesota, Fort Snelling, Minnesota, Minneapolis-Saint Paul International Airport, Bloomington, Minnesota
Termini Mall of America (south)
Target Field (north)
Stations 18 (plus 1 under construction)
Daily ridership 37,000 (2008)
Operation
Opened June 26, 2004
Operator(s) Metro Transit
Character Surface
Technical
Line length 12 mi (19.3 km)
Track gauge 1,435 mm (4 ft 8+12 in) (standard gauge)
Minimum radius of curvature 82 feet
Electrification Overhead lines, 750 V DC
Route map
BSicon .svg ueCONTg BSicon .svg
Bottineau Transitway (proposed)
ueCONTr uexABZlg BSicon .svg
Southwest Corridor (proposed)
BUS
CONTr
Target Field to Northstar Commuter Rail
BSicon .svg uSTR BSicon .svg
and proposed Red Rock, Duluth, etc. lines
BSicon .svg uAKRZo BSicon .svg
Interstate 394
BUS uHSTACC BSicon .svg
Warehouse District/Hennepin
BUS uHSTACC BSicon .svg
Nicollet Mall
BUS uHSTACC BSicon .svg
Government Plaza
BUS uHSTACC BSicon .svg
Downtown East/Metrodome
BSicon .svg uGRENZE BSicon .svg
Downtown fare zone limit
BSicon .svg ueABZlf ueCONTl
Central Corridor (proposed)
BSicon .svg uAKRZo BSicon .svg
Interstate 35W
BSicon .svg uHSTACC BSicon .svg
Cedar-Riverside
BSicon .svg uAKRZu BSicon .svg
Interstate 94
BUS
BSicon .svg
Franklin Avenue
BSicon .svg uELEVa BSicon .svg
Hiawatha Avenue
BUS
BSicon .svg
Lake Street/Midtown park & ride
BUS uHSTACC BSicon .svg
38th Street
BUS uHSTACC BSicon .svg
46th Street
BSicon .svg uTUNNEL2 BSicon .svg
Minnehaha Parkway
BSicon .svg uHSTACC BSicon .svg
50th Street/Minnehaha Park
BUS uHSTACC BSicon .svg
VA Medical Center
BSicon .svg uAKRZo BSicon .svg
Minnesota State Highway 62
BSicon .svg uHSTACC BSicon .svg
Fort Snelling park & ride
BSicon .svg uTUNNELa BSicon .svg
BUS
FLUG
Airport-Lindbergh Terminal
BSicon .svg
BSicon .svg
free, 24-hour operation between terminals
BSicon .svg
FLUG
Airport-Humphrey Terminal
BSicon .svg uAKRZu BSicon .svg
Interstate 494
BSicon .svg ueHST BSicon .svg
American Boulevard (Dec. 12, 2009)
BSicon .svg uHSTACC BSicon .svg
Bloomington Central
BUS uHSTACC BSicon .svg
28th Avenue park & ride
BUS uACCe BSicon .svg
Mall of America

The Hiawatha Line is a 12 mi (19.3 km) light rail corridor in Hennepin County, Minnesota that extends from downtown Minneapolis to the southern suburb of Bloomington, connecting to the Minneapolis-St. Paul International Airport and the Mall of America, among other destinations.

Hiawatha is operated by Metro Transit, which is also the primary operator of buses in the Twin Cities. It carried 9.4 million passengers in 2006,[1] meaning this single light rail line carries approximately 12% of the passengers on the entire Metro Transit system. In less than two years after opening, the line had already reached (and far exceeded) its 2020 ridership goals. As of December 2008, the line carried an average weekday passenger count of 37,000 people.

Contents

[edit] Stations and expansions

Each of the 18 stations along the route are designed in a unique architectural style reflective of each stations' surrounding community. This is not an entirely new idea for the region, as many of the higher-traffic bus stops around the city have distinctive designs. Due to the unique makeup of Minneapolis's population, ticket-dispensing machines present instructions in four languages: English, Spanish, Somali, and Hmong. Travel time is roughly two minutes between most stations. The airport used to operate a bus shuttle between the two terminals, but the light-rail line has supplanted that service. No fare is required to ride between the two airport stations.

[edit] Construction of Target Field Station

In November 2008, track welding was completed to extend the line several blocks north to reach the site of the Target Field Station. The station opened on November 14, 2009, and is adjacent to Target Field, the Minnesota Twins' new under-construction ballpark. The two-level station will have light rail platforms on the upper level for use by Hiawatha and Central Corridor light rail trains, as well as platforms next to the BNSF mainline tracks passing beneath the station to serve the Northstar Commuter Rail line, scheduled to open on November 16, 2009.[2] In addition, some routing options for the future Southwest Corridor LRT line would connect directly to the end of the Hiawatha Line to share service with the station.[3]

[edit] New station constructed in Bloomington

Federal money was secured for construction of the new American Boulevard Station in Bloomington between the Humphrey Terminal Station and Bloomington Central Station. This station was included in the line's original plans, but was supplanted by the decision to have a station directly at the Mall of America. Because much of the necessary underground infrastructure for the station was installed when the line was constructed, the station was built without interrupting regular service. The station will open December 12, 2009.[4]

[edit] 2009 expansion of existing stations

During the summer of 2009, work began on lengthening the station platforms. This will permit the use of 3-car trains, instead of the 2-car trains that are the current maximum. This allows the line to meet the continually growing demand, without adding additional trains to the schedule, or adding more drivers. The expansions are scheduled to be completed by March 2010. In 2008, passengers increased by 20% over 2007. And this is already 20% over the original projected ridership for the year 2020.

[edit] Service

Hiawatha Light Rail staff, security, and volunteers produced a largely hitch-free opening day for the new rail system on June 26, 2004. Officials estimated 30,000 people boarded the electric-powered trains during the transit system's first day of service. Train rides were free. Each station featured live entertainment and food as a diversion for the long waits to board the trains.

Passengers who ride the rail system are ordinarily charged the same fare as they would pay for the local Metro Transit bus system, and they are able to use their bus transfer cards to switch between the two different modes of transportation without making another payment. A new payment system using smart cards (known as Go-To Cards) was initially expected to be introduced along with the rail line in June 2004, but software bugs delayed introduction. As of September 2006, the bugs have been worked out and the Go-To Cards are now operational.

A Hiawatha Line Ticket, valid for 2½ hours after purchase.

In basic service, trains operate every 10 minutes, though rush hour sees one train every 7½ minutes, and late-night operation once every half hour. The line shuts down for about four hours each night, except for a shuttle service between the two terminals at the MSP airport. Vehicles have a capacity of 66 seated passengers and 120 standing. Two vehicles may be linked together to double capacity in busier periods. If the need ever arises for three-unit trains, some stations are already designed with that capacity, and others were built to be easily expandable to handle the longer trainsets. Predicted daily ridership is 19,300 for 2005 and 24,600 for 2020.

The line is named for Hiawatha Avenue, also known as Minnesota State Highway 55, which runs parallel to the train tracks for much of its distance. To integrate the train route with the rest of the area bus system, it was also given the name Route 55. In extremely heavy travel periods and when the rail line is out of service for any reason, buses use that route number. Before the second phase had been completed, a temporary bus line known as Route 155 provided a link to some destinations south of the Fort Snelling station.

Significant amounts of effort has gone into creating artwork for the different rail stations. In the months after the line first started, a number of small audio and video playback devices were installed in the stations, to provide amusement and topics for discussion among travelers waiting for the train.

There are two stretches where tunnels are used on the line. A short tunnel parallel to Hiawatha Avenue travels under Minnehaha Parkway just north of the 50th Street station. At the airport, twin tunnels (one each for the northbound and southbound trains) go underground for 1.7 miles (2.7 km) to reach the Lindbergh Terminal station, the only stop that is totally underground—70 feet (20 m) below the surface. Trains return to the surface as they near Humphrey Terminal. Some of the sections under the airport required the use of a tunnel boring machine.

[edit] Vehicles

A two-unit Hiawatha Line train approaches 46th Street station from the south.

The Hiawatha Line uses 27 Flexity Swift trams manufactured by Bombardier, electrically powered by overhead lines. The system is designed to output 750 volts of direct current. Trains can reach speeds of 55 miles per hour (88.5 km/h), but the “general service speed” is about 40 mph (64.4 km/h) or slower (especially in the congested downtown region). They are of a 70% low-floor design, meaning that 70 percent of the floor inside is within about 14 inches (356 mm) of the ground. This is the same height as the rail platforms, allowing stepless access for passengers dependent on wheelchairs or other mobility aids. The feature also makes it easier for passengers with bicycles or strollers to board the train. Each vehicle weighs about 107,000 pounds (48,534 kg) when empty. The Minneapolis installation is the first use of this model in the United States.[5]

Light-rail vehicles for the Hiawatha Line have been rolling along the line for testing and training purposes since late 2003. Vehicles have a color scheme that is primarily a combination of black, yellow, and gray. Yellow is a notable color because it was commonly used on the previous streetcar systems in the area. Each vehicle has an A, B, and C section: The A and B sections are the large portions on each end, while the C section is a small portion that connects the two other pieces and has the vehicle's middle truck or bogie. Electricity is collected by a pantograph mounted on the B section. The first vehicle was delivered on March 19, 2003. 14 of 15 delivered vehicles were operational for the opening weekend. The initial order was eventually bumped up to a full 24 vehicles, which were operational by early 2005. Three additional vehicles were ordered in the winter of 2006/2007, using leftover funds from the construction budget for one vehicle and Hennepin County funds for the other two. This brings the current total to 27 vehicles on the line.

The noses of these vehicles are built to a different design than is standard for the Flexity Swift, containing a small scoop-shaped area. This could assist somewhat in the removal of snow, but the anticipated snow-management method is merely to run trains on a frequent basis rather than actually using snow removal equipment (this was what the earlier streetcar system usually did to keep lines clear, though they also often featured small scrapers in front of the lead wheels).

Each vehicle has a number of cameras onboard, pointing both inward and outward, to monitor passenger activity and other areas of interest for security and safety. Train stations also have cameras. Video feeds and the position of each vehicle on the line are monitored in a control room at the system's maintenance facility, located between Cedar-Riverside and Franklin Avenue stations.

[edit] History

June 26, 2004. QuetzalCoatlicue dance troupe welcomes Hiawatha's first train at Midtown Station.

The Minneapolis-St. Paul area once had an extensive network of streetcars (operated for many years by Twin City Rapid Transit, a precursor of Metro Transit), but the tracks were removed and services were eliminated in the 1950s.

Over the years since the last trolley ran in 1954, many people have pushed for the reintroduction of rail transport in the Twin Cities. The primary reason is that traffic congestion has grown considerably since the last trolley ran in 1954: a 2003 report by the Texas Transportation Institute indicated that the area was the 17th most congested area in the country, with the second fastest congestion growth. Congestion is also one of the most prominent complaints of area residents. The area's population is expected to grow by about one million residents by 2020, adding to the population of nearly three million as of the 2000 census (Which means that in less than 20 years the area could have a population of 4 million similar in size to the metropolitan area of Phoenix, AZ.) While the Hiawatha Line isn't expected to make a significant dent in the region overall, proponents hope that the line's popularity will ensure future expansion will happen (in the first full month of service, ridership exceeded projections by 99.8%, although transit officials were wary about drawing too many conclusions so early on in the line's life).

No new rail projects were able to get off the ground for many years until the 1990s when several factors combined to make the idea more palatable to area politicians. Governor Jesse Ventura and Minnesota Transportation Commissioner Elwyn Tinklenberg heavily promoted the idea of rail transport, and significant amounts of money became available from the federal government. Previous governors had advocated light rail, but had not been able to get legislation passed. Governor Tim Pawlenty had campaigned on a promise to fight the expansion of light rail, but has altered his opinions since taking office. He also initially opposed the proposed Northstar Corridor commuter rail project, which would be a rail corridor north of Minneapolis, but changed his mind about that project in January 2004 when a scaled-back version was shown to have good potential.

For many, the Hiawatha Avenue corridor was not the top choice for a new project. Popular other options included connecting Minneapolis with western suburbs, though probably the most-desired option has been the Central Corridor connecting the Twin Cities themselves (Minneapolis and St. Paul) with a route down the middle of Interstate 94 or University Avenue. However, much of the land had already been acquired by the state in the 1960s in preparation for a sunken radial expressway into downtown that was never built. In addition to the available land, the desire to connect to the airport and at least reach the vicinity of the Mall of America proved to be the bigger draw for decisionmakers.

The idea of running a rail line down Hiawatha Avenue had already been around for at least a decade by the time the decision was made to go forward. In 1985, the Minnesota Department of Transportation (Mn/DOT) had produced an environmental impact statement that concluded that light rail was the best alternative for the corridor. In 1996, the document was examined again as Mn/DOT looked at the possibility of adding a busway (bus rapid transit) along the road, but money for light rail became available soon after, leading to the current layout.

Groundbreaking for the line took place on January 17, 2001. Regular service began on the first phase of the line on June 26, 2004, with the second phase opening later that year on December 4. Each opening was accompanied with two days of free rides on the train and area buses. The line was tested for months before opening, with regular service simulated for about a month before each phase went online. The Hiawatha Line opened 50 years and one week after the last regular-service streetcars ran in the city.

Busways are still being examined for many future projects, and it appears likely that at least one will be built. The most likely candidate for the area's second light rail line is the Central Corridor.

[edit] Funding and delays

The line's cost is expected to total $715 million, with $424 million coming from the federal government. This is considerably higher than initial budgets predicted—the figure was about $400 million in 1997. Opponents to the rail line state that it has gone far over-budget, but supporters of the line state that extensions of the route and other alterations, plus the impact of inflation, are the real reasons for the increased cost. Initial designs cut out the last stop in downtown, and the southern end of the line didn't quite connect to the Mall of America. The Warehouse District stop was added early, but another cost increase came from approximately $40 million to enhance the line (while construction was in progress) to bring the line directly into the Mall of America's transit hub. It is coming a year or two later than what was initially hoped for (a lot of literature pointed to 2003 as the opening year), but the mall connection was a significant contribution to the extra time requirements.

In March 2004, the labor union representing Metro Transit bus workers went on strike. This delayed the opening of the line from the anticipated start date of April 3, although there was some indication that the opening would have been delayed anyway. Apparently, some of the delay had to do with slow delivery of trainsets from Bombardier. Certain aspects of the design had been tried before, but the cars were the first to combine the factors of conforming to American standards (as opposed to European), having low floors, and being built at the company's Mexico plant. Some problems also cropped up during testing of the vehicles, but Bombardier has said that the issues are not out of the ordinary.

When the buses began rolling again on April 19, the line's opening was rolled back to June 26th. Testing of the track and vehicles continued during the bus strike, as much of the work was performed by Bombardier employees rather than Metro Transit workers. Train operators who had already gone through the training process were given refresher courses when the strike ended.

[edit] Signal problems

Delays of a different sort have afflicted cars and trucks running along Hiawatha Avenue and cross streets. The rail vehicles stop for traffic signals in downtown Minneapolis, but use signal preemption along much of the route, allowing the train to speed through by lowering gate arms at railroad crossings and turning traffic lights red. Synchronization of the different signals has been very problematic, reportedly causing some people to be stuck waiting at intersections for ten to fifteen minutes when the train was in its testing phase. Engineers from Metro Transit, the city of Minneapolis, and Mn/DOT have worked to get their respective systems communicating with each other, but delays are still common in the area.

Around the time of the line's opening, the Minneapolis City Council requested additional assistance from the Federal Highway Administration to resolve the issue, and the agency promised to send experienced engineers when they become available. However, it appears that improvements would require significant changes to the signal layout.

Delay issues are partially due to an unusual problem—the train horns. Residents along the rail corridor had complained that the horns were too loud, so transit officials decided to reduce the volume. However, this forced a reduction in service speed, as the quieter sound couldn't be heard at as great a distance. Some sections that were going to be limited to 55 mph were instead limited to 45 mph. Crossing gates and signals along the line are set to go off when the train is at a certain distance from the intersection, so the slower speed meant that the trains would trigger the gates prematurely.

In February 2005, the signals were upgraded at a cost of between $300,000 and $400,000 to improve traffic flow (the money came from leftover contingency funds in the system's construction budget). Changes involved moving the crossing trigger points closer to intersections, reprogramming the gates themselves to operate more quickly, altering the timings used when trains are at stations next to gated crossings, and altering the behavior of pedestrian crosswalks along the corridor. This is all expected to improve wait times on nearby roadways by 20 to 40 seconds.

[edit] See also

[edit] External links

[edit] References

  • Trisha Collopy (Summer 2004). The Right Track. Inventing Tomorrow (University of Minnesota).
  • "Down the Line; Light Rail's First Day." Star Tribune; June 27, 2004
  • Light Rail Now (August 2008)
  • [1]



Product Results (view all...)

search wiki for    ?
web dir firms image gallery news pdf wiki shop video 



↑ top of page ↑about thumbshots