Farringdon station Information & Farringdon station Links at HealthHaven.com
advertise
add site
services
publishers
database
health videos
Bookmark and Share

search wiki for    ?
web dir firms image gallery news pdf wiki shop video 
about
toolbar
stats
live show
health store
more stuff
JOIN/LOGIN
Featured Results:
Nasal Tube NG-tube, NJ-tubes, Gastrostomy tube G-tube, GJ-tubes,...
Nasal Tube NG-tube, NJ-tubes, Gastrostomy tube G-tube, GJ-tubes,...
livingwithreflux.org
 College Station Dentistry In A Great Location - College Station Dentist...
College Station Dentistry In A Great Location - College Station Dentist...
centraltexasdentist.com
 G-Tubes: Nasogastric Tube s, Feeding Tube s
G-Tubes: Nasogastric Tubes, Feeding Tubes
rdmedicalonline.com
 
Farringdon
Farringdon station building.JPG
Main station entrance
Farringdon is located in Central London
Farringdon

Location of Farringdon in Central London
Location Farringdon
Local authority London Borough of Islington
Managed by London Underground
Station code ZFD
Platforms in use 4
Fare zone 1
NR 2006/7 usage 1.637 million[1]
NR 2007/8 usage 1.706 million[1]
LUL 2007 usage 18.285 million[2]
LUL 2008 usage 18.84 million[2]

1863 (1863) Opened

List of stations Underground · National Rail
External links DeparturesFacilities

Coordinates: 51°31′12″N 0°06′19″W / 51.520°N 0.1053°W / 51.520; -0.1053

Farringdon station is a London Underground and National Rail station in Clerkenwell, just north of the City of London in the London Borough of Islington.

Contents

[edit] Services

The London Underground part of the station is served by Metropolitan, Hammersmith & City and Circle Line services, the stations on either side being King's Cross St. Pancras and Barbican.

Farringdon is also served by First Capital Connect trains from Brighton to Bedford, calling at Gatwick Airport, or from Luton to Sutton or Wimbledon. The stations on either side are City Thameslink and St Pancras International.

Until 20 March 2009 some First Capital Connect weekday peak-hour trains ran into Moorgate and terminated there rather than continuing south to Blackfriars and beyond. These services were withdrawn to allow the platforms to be extended to take 12-coach trains. The extended platforms will be built over the junction for the former Moorgate branch line: there is no room on the north side for any extension because the tracks leave the station on a downward gradient.

Passengers can still travel from Farringdon to Barbican and Moorgate using the parallel London Underground service.

Farringdon is in Transport for London's Travelcard Zone 1.

[edit] History

The station was opened on 10 January 1863 as the terminus of the original Metropolitan Railway, the world's first underground metro line. The station, initially named Farringdon Street, was originally located a short distance from today's building. The line ran from Farringdon to Paddington, a distance of 4 miles (6 km). The station was relocated on 23 December 1865 when the Metropolitan Railway opened an extension to Moorgate. It was renamed Farringdon and High Holborn on 26 January 1922, and its present name on 21 April 1936.[3]

The lines from Farringdon to King's Cross station run alongside the now culverted Fleet River, which was above ground here until 1812. The station building is an unusually well-preserved piece of early 20th-century London Underground architecture; it still has its original signage (with the name "Farringdon and High Holborn" on the facade) and other indications of the Metropolitan Railway's original operation like the main line companies, with a sign for a "Parcel Office" surviving on the exterior wall.

After the bay platforms at London Blackfriars closed in March 2009, Southeastern services which previously terminated at Blackfriars were extended to Kentish Town, St Albans, Luton or Bedford, calling at this station.[4] Through First Capital Connect services to Moorgate ceased at the same time. Train services south of Blackfriars services are operated by Southeastern, north of Blackfriars by First Capital Connect.

There are plans to increase the station's passenger capacity as part of the Thameslink Programme. Work on replacing the footbridge started during late 2008. The new Turnmill Street entrance/exit opened on Monday 23 March 2009. It is an exit-only for the morning peak and entrance-only for the evening peak.

[edit] Plans

As part of the Thameslink Programme an additional ticket hall will be built on the south side of Cowcross Street providing access to the Thameslink platforms, which will be extended southwards underneath this building, allowing the station to handle 240m (12-car) trains. Works will begin in 2009 with the demolition of Cardinal Tower, a 12 storey office building currently on the site, and will be completed by the end of 2011. The new building is being commissioned from architects firm Aukett Fitzroy Robinson.[5]

The existing station building will be refurbished and a new roof canopy added to cover the north end of all four platforms. A permanent new entrance and concourse facing Turnmill Street will be created, and lifts will be provided throughout.

It is planned to locate a "Farringdon" Crossrail station between Farringdon and Barbican stations, with interchanges to both.[6]. Access at the Farringdon end will be via the new Thameslink ticket hall. Work, although authorised, has yet to start and completion of Crossrail is not anticipated until 2017[7].

[edit] Dual supply

Farringdon Station is also notable because the First Capital Connect trains, whilst standing at the platform, switch between the 25kV AC overhead supply used to the north of London, and the 750V DC third rail supply used to the south. The trains that formerly ran to Moorgate used 25kV AC throughout their journeys.

The Underground trains use the four-rail 630V DC system.

Until the start of the Thameslink Programme, southbound trains which experienced a fault preventing them from switching to DC would be terminated at Farringdon and stabled at Moorgate to prevent them from blocking the Thameslink corridor. However once Farringdon's platforms are extended southwards the Moorgate branch will be cut off, so the catenary is being extended to City Thameslink to enable trains to use the new crossover in Snow Hill tunnel and return northwards[8]. Farringdon will remain the point for changeover of Traction current.

[edit] Nearest places

[edit] Service patterns

Preceding station   Underground no-text.svg London Underground   Following station
towards Baker Street
Circle line
towards Tower Hill
towards Hammersmith
Hammersmith & City line
towards Barking
Metropolitan line
towards Aldgate
National Rail National Rail
St Pancras International   First Capital Connect
Thameslink
  City Thameslink
First Capital Connect
Bedford-Sevenoaks
Disused railways
St Pancras International   First Capital Connect
Thameslink
(Moorgate Branch)
  Barbican
King's Cross (York Road)   British Rail
Eastern Region

City Widened Lines
  Barbican
Future Development
Preceding station   Crossrail   Following station
Crossrail

[edit] Gallery

[edit] London Underground

Circle, Hammersmith & City and Metropolitan lines

Side Platform
Circle towards High Street Kensington
Hammersmith & City towards Hammersmith
Metropolitan towards Aldgate

Circle towards Liverpool Street
Hammersmith & City towards Barking
Metropolitan towards Uxbridge, Amersham, Chesham or Watford
Side Platform

[edit] References

  1. ^ a b Annual passenger usage based on sales of tickets in stated financial year(s) which end or originate at Farringdon station from Office of Rail Regulation statistics
  2. ^ a b Transport for London - London Underground performance update
  3. ^ a b Rose, Douglas (1999). The London Underground: A diagrammatic history. Capital Transport Publishing. ISBN 1854142194. 
  4. ^ "Train times 22 March - 16 May 2009 Thameslink route". First Capital Connect. http://www.firstcapitalconnect.co.uk/content/doc/timetables/tttl_book_pdf_ontime_final_ver.pdf. Retrieved 20 March 2009. 
  5. ^ "Farringdon station". Aukett Fitzroy Robinson. http://www.aukettfitzroyrobinson.com/02_sectors/2F_transport/2F_01_tx.htm. Retrieved 2009-07-11. 
  6. ^ Crossrail - Farringdon (PDF). 28 October 2006
  7. ^ Crossrail website accessed 09 Dec 2007
  8. ^ Thameslink Programme FAQ - City Thameslink 'Powered Up' section accessed 31 July 2009

[edit] External links




Product Results (view all...)

search wiki for    ?
web dir firms image gallery news pdf wiki shop video 



↑ top of page ↑about thumbshots