All Weather Rain Gauge - Weather Temperature Gauge - Weather Gauge allegromedical.com | Double Gauge Regulator,AN611 Double Gauge Regulators,Oxygen Double Gauge... anaesthesia-products.com | Broken teeth broken tooth - Case studies Kissdental kissdental.co.uk | health farm holiday, weekend break, health farm day break uk - Ragdale... ragdalehall.co.uk |
With railways, a break-of-gauge is where a line of one gauge meets a line of a different gauge. Trains and rolling stock cannot run through without some form of conversion between gauges, and freight and passengers must otherwise be transloaded. Either way, a break-of-gauge adds delays, cost and inconvenience to traffic that must pass from one gauge to another.
[edit] Inconvenience One solution to the break-of-gauge problem – the transporter car Transloading of freight from cars of one gauge to cars of another is very labour and time intensive, and increases the risk of damage to goods. If the capacity of freight cars on each system does not match, additional inefficiencies arise. Technical solutions to avoid transloading include variable gauge axles, replacing the trucks of cars, and the use of transporter cars that can carry a car of a different gauge. Talgo and Construcciones y Auxiliar de Ferrocarriles have developed dual gauge axles (variable gauge axles) which permit through running between broad gauge and standard gauge. In Japan the Gauge Change Train has been built on Talgo patents[citation needed] that can run on standard and narrow (1067 mm) gauge. In some cases, breaks-of-gauge are avoided by installing dual gauge track, either permanently or as part of a changeover process between gauges. At almost every break-of-gauge, passengers have to change trains, but there are a few passenger trains that runs through a break-of-gauge. For example, the Talgo (variable gauge axles, see above), and the Moscow-Beijing trains (bogie exchange). [edit] PassengersFor passengers trains the inconvenience is less, especially if it is at a major train station, where many passengers change trains or end their journey anyway. Therefore some passenger-only railways have been built with other gauges than would otherwise be used in a country, like the high-speed railways in Japan and Spain. For night trains, which are very common in places like Russia, train change is less desired, especially by night. For these often the bogies are replaced, even if it takes much more time than having the passengers change trains. [edit] Tidal trafficThe inefficiencies of a break of gauge are especially apparent when there is a tide of traffic in one direction, as might happen when fodder from a drought-free region needs to be transhipped to a drought-affected region on the other gauge. Firstly, one might run out of suitable wagons on the other gauge, while loaded wagons unable to be transhipped obstruct the main lines or crossing loops on the first gauge. [edit] Overcoming a break of gaugeWhere trains encounter a different gauge, such as at the Spanish-French border or the Russian-Chinese one, the traditional solution has always been transshipment — transferring passengers and freight to cars on the other system. This is obviously far from optimal, and a number of more efficient schemes have been devised. One common one is to build cars to the smaller of the two systems' loading gauges with bogies that are easily removed and replaced, with a bogie exchange at an interchange location on the border. This takes a few minutes per car, but is quicker than transshipment. A more modern and sophisticated method is to have multigauge bogies whose wheels can be moved inward and outward. Normally they are locked in place, but special equipment at the border unlocks the wheels and pushes them inward or outward to the new gauge, relocking the wheels when done. This can be done as the train moves slowly over special equipment. When transhipping from one gauge to another, chances are that the quantity of rolling stock on each gauge is unbalanced, leading to more idle rolling stock on one gauge than other. In some cases, breaks of gauge are avoided by installing dual gauge track, either permanently or as part of a changeover process to a single gauge. In other cases (in Spain) variable gauge axles are used. [edit] Piggyback operationOne method of achieving interoperability between rolling stock of different gauges, is to piggyback stock of one gauge on special transporter wagons. This enables rolling stock to reach workshops and other lines of the same gauge to which they are not otherwise connected. Piggyback operation by the trainload occurred as a temporary measure between Port Augusta and Marree during gauge conversion works in the 1950s, to bypass steep gradients in the Flinders Ranges. Narrow gauge railways were favoured in the underground slate quarries of North Wales, as tunnels could be smaller. The Padarn Railway operated transporter wagons on their 4 ft (1,219 mm) gauge railway, each carrying four 1 ft 103⁄4 in (578 mm) slate trams. When the Great Western Railway acquired one of the narrow gauge lines in Blaenau Ffestiniog, they used a similar type of transporter wagon in order to use the quarries' existing slate wagons.[1] Transporter wagons are most commonly used to transport narrow gauge stock over standard gauge lines. More rarely, standard gauge vehicles are carried over narrow gauge tracks using adaptor vehicles; examples include the Rollbocke transporter wagon arrangements in Germany, Austria and the Czech Republic and the milk transporter wagons of the Leek and Manifold Valley Light Railway in England. [edit] ContainerisationThe widespread use of containers since the 1960s has made break of gauge less of a problem, since containers are efficiently transferred from one mode to another by suitable large cranes. Consider the transfer from a train of one gauge to another train of a different gauge. It helps if the lengths of the wagons on each gauge are the same so the containers can be transferred from one train to the other with no transverse movement along the train. The different wagons should carry the same number of containers. Delays to each train depends on how many cranes can operate simultaneously. Clearly the more cranes, the more idle time that they have and the more staff that you need, so this is an economic decision. Container cranes are relatively portable, so that if the break of gauge transshipment hub changes from time to time, the cranes can be moved around as required. Fork lift trucks can also be used. There is a gauge transshipment station at Kidatu in Tanzania. [edit] Major breaks of gaugeMajor breaks of gauge between large systems include: [edit] Africa
[edit] Angola
[edit] Democratic Republic of Congo
[edit] TanzaniaThe cape gauge system of southern Africa and the metre gauge system of east Africa meet at a transshipment hub at Kidatu in Tanzania. [edit] Asia[edit] BangladeshBangladesh has decided to resolve most of its break-of-gauge problem by converting most of its broad and narrow gauge tracks to dual gauge. [edit] ChinaChina (standard gauge) on one hand, Mongolia, Russia and Kazakhstan (1520 mm) on the other. See the Trans-Manchurian Railway, the Trans-Mongolian Railway and the Lanxin railway. China (standard gauge), Vietnam (metre gauge)
[edit] IndiaIndia has decided that towns on the narrow gauge system get a second class service, and has decided to convert a significant proportion of the narrow gauge system to broad gauge. This is called Project unigauge. [edit] IranIran, with its standard gauge rail system, has break-of-gauge at the borders with Azerbaijan and Turkmenistan, and now also has a new break-of-gauge with Pakistan at Zahedan. Pakistan has a broad gauge railway system. The break-of-gauge station at Zahedan was built outside the city, as the existing station was hemmed in by built up areas. [3][dead link] [edit] JapanWhile the old national rail network is in narrow gauge 3 ft 6 in (1,067 mm), all high speed lines have been built as standard gauge lines. Some lesser towns are served by dual gauge high speed lines. Private railways often use other gauges, but being passenger lines, interchange is not too much of a problem. [edit] North KoreaThe break of gauge occurs on either side of the border river. [edit] MongoliaTrans-Mongolian Railway in Russia and Mongolia 1520mm in China 1435mm. [edit] ThailandSeveral countries bordering Thailand use meter gauge track, but there are missing links between Thailand and Vietnam via Cambodia. [edit] Vietnam
[edit] Europe
[edit] Oceania[edit] Australia The break-of-gauge platform for the Sydney-Melbourne railway at Albury station; SG on left; BG on right.
[edit] North America
[edit] South America
[edit] Minor breaks of gaugeWherever there are narrow gauge lines that connect with a standard gauge line, there is technically a break-of-gauge. If the amount of traffic transferred between lines is small, this might be a small inconvenience only. In Austria and Switzerland there are numerous breaks-of-gauge between standard-gauge main lines and narrow-gauge railways. The line between Finland and Russia has a minor break-of-gauge. Finnish gauge is 1524 mm and Russian 1520 mm, but this does not stop through-running. The effects of a minor break-of-gauge can be minimized by placing it at the point where a cargo must be removed from cars anyway. An example of this is the East Broad Top Railroad in the United States of America, which had a coal wash and preparation plant at its break-of-gauge in Mount Union, Pennsylvania. The coal was unloaded from narrow gauge cars of the EBT, and after processing was loaded into standard gauge cars of the Pennsylvania Railroad. In addition to its broad-gauge lines, Spain has modern high-speed lines operating at standard gauge, and uses gauge converters. These railways are used for passengers only, and they have to change train, usually in big cities where they would have to change train anyway. [edit] Gauge orphanWhen a main line is converted to a different gauge, such as with Unigauge in India, branch lines can be cut off and made relatively useless, at least for freight trains, until they too are converted to the new gauge. These severed branches can be called gauge orphans. Or is a service is maintained using variable gauge axle systems such as SUW 2000. [edit] Gauge thrustThe opposite of a gauge orphan is a line of one gauge which thrusts into the territory composed mainly of another gauge. Examples include five broad gauge lines of Victoria which crossed the border into otherwise standard gauge New South Wales. Similarly the standard gauge line from Albury to Melbourne in 1962 which eliminated most transshipment at Albury, especially the need for passengers to change trains in the middle of the night. A Russian broad gauge line thrusts from Ukraine into Slovakia to carry minerals and another broad gauge line thrusts also from Ukraine into Poland to carry iron ore and steel products without the need for transshipment as would be the case if the gauge changed at the border. In 2008, it is proposed to extend the Slovak line to Vienna. [7] The gauge thrust from Kalgoorlie to Perth, Western Australia partly replaced the original narrow gauge line, and partly rebuilt that line with better curves and gradients at double dual gauge. [edit] Ideal locationTransshipment hubs at breaks-of-gauge tend to happen at or near international borders as this tends to resolve the inevitable jealousies. Taken to its logical but absurd limits, the break-of-gauge can be like Wallangarra where it straddles the state borders, with the station building being designed half with Queensland architecture and half with New South Wales architecture. A more sensible solution would have been to build the break-of-gauge at the already existing town of Tenterfield, 10 km away. Passenger breaks-of-gauge should be located at important towns and not in the middle of nowhere, where sleepers may have to be woken in the middle of the night. [edit] See also
[edit] Other issuesWhile track gauge is the most important factor preventing through running between adjacent systems, other issues can also be a hindrance, including loading gauge, couplings, brakes, electrification, signalling systems, rules and regulations, and language. [edit] External links